BMD contracted our team to complete the earthmoving required for the Stockroute Rd Extension Project. A neat project where we carried the clearing of existing canefields to stockpile. We then carried out all topsoil strips to stockpile. The roadway was boxed out, and the material went to spoil. We then cut to grade the new drain required with 3:1 batters. This was designed and 3D-modelled prior to being uploaded to our machine's GPS control system. Once concrete curbing was completed and bitumen was laid, we returned to the site to re-topsoil drains, vacant areas, and adjacent pathways prior to being turfed.