Mirani Waste Water Project

Project details

Bowman's Earthmoving was contracted to carry out all major bulk earthworks on the new sporting complex at CQUniversity in conjunction with Mackay Regional Council. Over six months, we excavated two major drains with spoil to stockpile. The drains were multi-tiered with varying batters and sizes on a curved GPS line. We cut to spoil on grade and used some material to fill and raise the adjacent sporting field 1m. This field was then levelled to allow drainage in rainfall events. The major stormwater drains were then topsoiled 100mm on grade before being turfed. Our machines were also utilised to box out the running track and cut to grade subsoils before the track construction took place. All fill materials for the raising of building pads was imported with our machines from the storm water drain excavations.