Bowman's Earthmoving was contracted to complete all major earthmoving requirements for constructing a 300-megalitre water storage for the expanding township of Mirani. Once constructed, a 900m pipeline was installed to the existing 60 megalitre storage at the local council wastewater treatment facility. We carried out a survey and design for the topsoil pre-strip to stockpile, boxed out the key trench, cut to fill from the basin to the wall embankment, final trim of the embankment and re-topsoil inside and outside batters for seeding. Our team completed this project four weeks ahead of schedule.